|
|
-Upon Exhibitor's request, the Organizer shall install water pipe
lines from existing facilities to the Exhibitor's booth
according to the following specifications.
-If there is any danger of machines becoming damaged due to
water being cut off or a drop in water pressure, the Exhibitor
shall install protective devices. The Organizer shall not be held
liable in any way for the damage that may result.
-Exhibitors must cut off their water supply upon closure of the exhibition.
|
Classification |
Unit Price |
Electricity Supply |
Power supply |
Single-Phase 220V : For lighting |
Daytime US $ 50 / Kw |
Three-Phase 220V : For power |
Three-Phase 380V : For power & special lighting |
24 Hours |
US $ 80 / Kw |
Telephone |
Local Call Only |
Including long distance calls |
US $ 50 / Ea |
Water supply |
Pressure |
10 ㎏ / ㎤ (max) |
US $ 150 / Ea |
Sub piping size |
20mm(ψ)(max) |
Water drainage |
Sub piping size |
75mm(ψ)(max) |
Compressed Air |
Pressure |
8kg/㎥(max) |
Sub piping size |
20mm(ψ)(max) |
LAN |
|
T1 Line |
US $ 150 / Port |
Bar-Code System |
HANDY |
Key-Fair System |
US $ 200 / Ea |
|
|
Submit an Water Supply and Drainage Installation application with your application for show participation or |
download an application for auxiliary services and send it by fax or E-mail to OLED EXPO 2020 Secretariat. |
|
OLED EXPO 2020 Secretariat |
E-mail : oled@exponu.com / Fax : +82-2-783-7292 |
|